| 2.2.1 14 | CADENA DE CERRAMIENTO CE2 , INCLUYE CIMBRA COM脷N Y DESCIMBRA SECCI脫N 20 X 20 CM, CONCRETO F'C=150 KG/CM2-3/4", REFORZADA CON 4 VAR 3/8 Y EST. # 2 @ 20 CMS. GALVANIZADO POR INMERSION EN CALIENTE | ML |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO F-C=150 H/O | CONCRETO F'c=150 KG/CM2, HECHO EN OBRA AGREGADO MAXIMO GRAVILLA 3/4" | M3 | 0.041000 | $781.40 | $32.04 |
| ACERO | ACERO REF.VAR.DIAM. | KG | 4.220000 | $9.40 | $39.67 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 2.250000 | $5.90 | $13.28 |
| CIMBRAPLAY | CIMBRAPLAY 16 MM | m2 | 0.320000 | $69.00 | $22.08 |
| CLAVO | CLAVO | KG | 0.250000 | $13.50 | $3.38 |
| DIESEL | DIESEL | LT | 0.258500 | $4.20 | $1.09 |
| ALAMBRE 16 MM | ALAMBRE GALVANIZADO | KG | 0.118000 | $16.95 | $2.00 |
| GALVANIZADO POR INME | KG | 4.380000 | $3.00 | $13.14 | |
| Suma de Material | $126.66 | ||||
| Mano de Obra | |||||
| CUADRILLA E-OC-02 | (1 ALBA脩IL + 1 AYUDANTE DE ALBA脩IL) | JOR | 0.100000 | $576.23 | $57.62 |
| Suma de Mano de Obra | $57.62 | ||||
| Herramienta | |||||
| ANDAMIO METALICO | HASTA UNA ALTURA DE 6.00 M | R/DIA | 0.100000 | $45.00 | $4.50 |
| Suma de Herramienta | $4.50 | ||||
| Costo Directo | $188.78 |