| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 2.2.2. 8 | LOSA RETICULAR EN ESTRUCTURA, PERALTE = 5 CM , CONCRETO F'C = 250 - 3/4" PREMEZCLADO, BOMBEADO, VIBRADO Y CON ACELERANTTE, ARMADA CON MALLA ELECTROSOLDADA 6*6/10*10 GALVANIZADA POR INMERSION EN CALIENTE. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO DE 250 | CONCRETO PREMEZCLADO BOMBEABLE DE 250 KG/CM2, INCLUYE: CONCRETO CPO, REVENIMIENTO 12-14. | M3 | 0.052000 | $949.00 | $49.35 |
| BOMBEO | BOMBEO DE CONCRETO | M3 | 0.052000 | $110.00 | $5.72 |
| ALAMBRE 16 MM | ALAMBRE GALVANIZADO | KG | 0.150000 | $16.95 | $2.54 |
| MALLA 6X6 10X10 | M2 | 1.150000 | $13.00 | $14.95 | |
| GALVANIZADO DE MALLA | GALVANIZADO DE MALLA | KG | 1.160000 | $4.00 | $4.64 |
| GALLETA DE CONCRETO | PZA | 3.000000 | $2.10 | $6.30 | |
| Suma de Material | $83.50 | ||||
| Costo Directo | $83.50 |