| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 2.2.1 10 | CASTILLO DE CONCRETO (K14)SECCION= 20 X 60 CM, CONCRETO F'C=150 KG/CM2-3/4", CIMBRA 2 CARAS, REFORZADO CON 10 VAR. DEL #5 Y EST. # 2 @ 20 CMS. GALVANIZADO POR INMERSION EN CALIENTE | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO F-C=150 H/O | CONCRETO F'c=150 KG/CM2, HECHO EN OBRA AGREGADO MAXIMO GRAVILLA 3/4" | M3 | 0.123000 | $781.40 | $96.11 |
| ACERO | ACERO REF.VAR.DIAM. | KG | 9.100000 | $9.40 | $85.54 |
| MADERA-2 | MADERA DE PINO DE 3A. EN BARROTE DE 2" X 4" | PT | 5.250000 | $5.90 | $30.98 |
| CIMBRAPLAY | CIMBRAPLAY 16 MM | m2 | 0.247200 | $69.00 | $17.06 |
| DIESEL | DIESEL | LT | 0.320000 | $4.20 | $1.34 |
| ALAMBRE 16 MM | ALAMBRE GALVANIZADO | KG | 0.350000 | $16.95 | $5.93 |
| CLAVO | CLAVO | KG | 0.300000 | $13.50 | $4.05 |
| GALVANIZADO POR INME | KG | 9.464000 | $3.00 | $28.39 | |
| Suma de Material | $269.40 | ||||
| Mano de Obra | |||||
| CUADRILLA E-OC-02 | (1 ALBAÑIL + 1 AYUDANTE DE ALBAÑIL) | JOR | 0.142860 | $576.23 | $82.32 |
| Suma de Mano de Obra | $82.32 | ||||
| Herramienta | |||||
| ANDAMIO METALICO | HASTA UNA ALTURA DE 6.00 M | R/DIA | 0.100000 | $45.00 | $4.50 |
| Suma de Herramienta | $4.50 | ||||
| Costo Directo | $356.22 |