| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 3.01.02.026-H.10-2-3 | EN ZAPATAS | m3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO PRE-05 | CONCRETO PREMEZCLADO DE F'C= 250 KG/CM2 | M3 | 1.050000 | $720.00 | $756.00 |
| CIMBRA-04 | MADERA DE PINO | PT | 3.000000 | $5.15 | $15.45 |
| CIMBRA-01 | CIMBRAPLAY | M2 | 0.300000 | $73.76 | $22.13 |
| CIMBRA-02 | CLAVO | Kg. | 0.020000 | $8.77 | $0.18 |
| CONCRETO PRE-02 | BOMBA PARA CONCRETO | M3 | 0.730000 | $140.00 | $102.20 |
| Suma de Material | $895.95 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 09 | (1 Of. Albanil + 1 Peón) | JOR | 0.150000 | $477.52 | $71.63 |
| Suma de Mano de Obra | $71.63 | ||||
| Equipo | |||||
| MAQUINARIA-23 | VIBRADOR PARA CONCRETO KOHLER 8 HP BASE TIPO JAULA | HR** | 0.182229 | $13.03 | $2.37 |
| Suma de Equipo | $2.37 | ||||
| Auxiliar | |||||
| ANDAMIO 2 MTS | ANDAMIO DE 2.00 MTS DE ALTURA | DIA | 0.150000 | $21.98 | $3.30 |
| Suma de Auxiliar | $3.30 | ||||
| Costo Directo | $973.25 |