| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| N路CTR路CAR路1路02路003 | Concreto de f'c = 150 kg/cm虏 | m3 |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0171-95 | CURACONSA BLANCO, MENBRANA DE CURADO PARA CONCRETO | lt | 0.200000 | $16.00 | $3.20 |
| CONC PREM 150 | CONCRETO PREMEZCLADO F'C=150 KG/CM2 | m3 | 1.030000 | $1,050.30 | $1,081.81 |
| Suma de Material | $1,085.01 | ||||
| Mano de Obra | |||||
| 02-0440 | CUADRILLA No 44 ( 1 ALBA脩IL + 4 PEONES ) | JOR | 0.200000 | $1,554.18 | $310.84 |
| Suma de Mano de Obra | $310.84 | ||||
| Equipo | |||||
| 03-4020 | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES INCLUYE OPERACION | Hora | 0.333333 | $59.32 | $19.77 |
| Suma de Equipo | $19.77 | ||||
| Auxiliar | |||||
| CIM LOSAS | CIMBRA EN LOSAS | m2 | 5.200000 | $167.45 | $870.74 |
| Suma de Auxiliar | $870.74 | ||||
| Costo Directo | $2,286.36 |