| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| EXT-28 | SUMINISTRO Y COLOCACION DE LAMBRIN DE TABLAROCA EN PLAY GRAUND CAJILLO DE A.A. 1.22 2.44 , INCLUYE :ACABADO CON PASTA REDIMIX , PEERFILES , METALICOS CAL. 26 , CANALETAS DE CARGA , MATERIALES , MANO DE OBRA , HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TABLA ROCA | TABLA ROCA | M2 | 1.100000 | $42.00 | $46.20 |
| REDIMIX 28 KG | PASTA REDIMIX EN SACO DE 28 KG | KG | 0.900000 | $6.23 | $5.61 |
| POSTE 635 CAL.20 | GALVANIZADO | ML | 2.700000 | $10.15 | $27.41 |
| CANAL 635 CAL.20 | GALVANIZADO | ML | 0.900000 | $9.00 | $8.10 |
| ESQUINERO METALICO | ESQUINERO METALICO | ML | 0.500000 | $3.61 | $1.81 |
| TORNILLO 1/2 " TEK | PUNTA DE BROCA | PZA | 14.000000 | $0.15 | $2.10 |
| PERFACINTA | PERFACINTA | ML | 2.100000 | $3.83 | $8.04 |
| Suma de Material | $99.26 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 31 | (1 Of. Yesero + 1 Ayudante) | JOR | 0.100000 | $859.54 | $85.95 |
| Suma de Mano de Obra | $85.95 | ||||
| Herramienta | |||||
| ANDAMIAJE | 0 | R/DIA | 0.150000 | $130.17 | $19.53 |
| Suma de Herramienta | $19.53 | ||||
| Costo Directo | $204.74 |