| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| III.2.- | PLANTILLA DE CONCRETO DE F'c= 100 KG/CM2 DE 5 CM DE ESPESOR.INCLUYE MATERIALES Y MANO DE OBRA. | M2 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| OC-CONCRETO-001 | SERVICIO DE BOMBEO | M3 | 0.055500 | $150.00 | $8.33 |
| OC-CONCRETO-001 | SERVICIO DE BOMBEO | M3 | 0.055500 | $150.00 | $8.33 |
| OC-ACERO-01 | ALAMBRE RECOCIDO | KG | 0.100000 | $19.13 | $1.91 |
| OC-ACERO-01 | ALAMBRE RECOCIDO | KG | 0.100000 | $19.13 | $1.91 |
| OC-MAD 004 | MADERA DE PINO DE 3A. | PT | 0.500000 | $11.50 | $5.75 |
| OC-MAD 004 | MADERA DE PINO DE 3A. | PT | 0.500000 | $11.50 | $5.75 |
| OC-CLAVO | CLAVO DE 2 1/2" A 3 1/2" | KG | 0.020000 | $20.87 | $0.42 |
| OC-CLAVO | CLAVO DE 2 1/2" A 3 1/2" | KG | 0.020000 | $20.87 | $0.42 |
| Suma de Material | $32.81 | ||||
| Mano de Obra | |||||
| OC-CUA8 | CUADRILLA (1 ALBAÑIL + 1 PEON) | JOR | 0.040000 | $941.52 | $37.66 |
| OC-CUA8 | CUADRILLA (1 ALBAÑIL + 1 PEON) | JOR | 0.040000 | $941.52 | $37.66 |
| Suma de Mano de Obra | $75.32 | ||||
| Auxiliar | |||||
| OC-CONC F-C=100 | Concreto f'c=100kg/cm2, normal agreg. 3/4" fabricado en obra a mano incluye: acarreos 1a. estacion a 20.00m. | M3 | 0.050000 | $1,143.90 | $57.20 |
| OC-CONC F-C=100 | Concreto f'c=100kg/cm2, normal agreg. 3/4" fabricado en obra a mano incluye: acarreos 1a. estacion a 20.00m. | M3 | 0.050000 | $1,143.90 | $57.20 |
| Suma de Auxiliar | $114.39 | ||||
| Costo Directo | $222.52 |