| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| EXT-25 | CAJILLO PERIMETRAL PARA ILUMINACION DE DUROCK Y BASTIDOR A BASE DE POSTES Y ANGULOS GALVANIZADOS CON UN DESARROLLO DE .85 MTS. ACABADO CON PASTA BASECOAT A UNA ALTURA D 7 MTS. INCLUYE : ACARREOS DE MATYERIAL , ANDAMIAJE , MATERIALES , MANO DE OBRA , HERRAMIENTAS Y TODO LO NECESARIO PARA SU CORRECTA EJECUCION . | ML |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| DUROCK TABLA CEMENT | DUROCK TABLA CEMENTO DE 1.22 X 2.44 M . | M2 | 0.800000 | $160.00 | $128.00 |
| BASECOAT | SACOS 22.5KGS. | KG | 3.600000 | $12.00 | $43.20 |
| REBORDE J DE PLASTI | REBORDE J DE PLASTICO | ML | 1.030000 | $16.35 | $16.84 |
| CANAL LISTON CAL.26 | CALIBRE 26 . METAL GALVANIZADO | ML | 3.600000 | $6.00 | $21.60 |
| CANALET. DE CARGA22 | CALIBRE 22 . METAL GALVANIZADO | ML | 1.900000 | $5.57 | $10.58 |
| ALAMBRE GALV. CAL.14 | ALAMBRE GALV. CAL.14 | KG | 0.250000 | $12.50 | $3.13 |
| TORNILLO DUROCK | TORNILLO DUROCK | PZA | 18.000000 | $0.35 | $6.30 |
| PERFACINTA | PERFACINTA | ML | 2.100000 | $3.83 | $8.04 |
| Suma de Material | $237.69 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 31 | (1 Of. Yesero + 1 Ayudante) | JOR | 0.166670 | $859.54 | $143.26 |
| Suma de Mano de Obra | $143.26 | ||||
| Herramienta | |||||
| ANDAMIAJE | 0 | R/DIA | 0.150000 | $130.17 | $19.53 |
| Suma de Herramienta | $19.53 | ||||
| Costo Directo | $400.48 |