| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 130403 | Interruptor S1-S2 | un |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| TUBOPVCO10 | Tubo pvc-conduit ½" - Pavco | ml | 4.000000 | $4,816.00 | $19,264.00 |
| CABLECOBT012 | Cable cobre THHN/THWN 12 awg | ml | 12.000000 | $1,689.00 | $20,268.00 |
| CURPVC01 | Curva pvc conduit ½ | un | 2.000000 | $599.00 | $1,198.00 |
| ADAPVC01 | Adaptador pvc conduit ½" | un | 2.000000 | $302.00 | $604.00 |
| CAJAGAL05 | Caja galvanizada 4x4 cumple norma retie | un | 1.000000 | $1,835.00 | $1,835.00 |
| SUICHE10 | Suiche 2 palanca Levinton | un | 1.000000 | $10,640.00 | $10,640.00 |
| CINTAS33 | Cinta sctch 33 19mmx8m | un | 0.050000 | $13,952.00 | $697.60 |
| VARIO | Varios electricos | un | 0.200000 | $1,318.00 | $263.60 |
| Suma de Material | $54,770.20 | ||||
| Mano de Obra | |||||
| ZCUADIEL | Cuadrilla Instalaciones Eléctricas | jor | 0.076628 | $116,803.00 | $8,950.38 |
| Suma de Mano de Obra | $8,950.38 | ||||
| Herramienta | |||||
| HERRA | Herramienta menor | (%)mo | 0.050000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| TRMAT | Transporte materiales | glo | 1.000000 | $1,000.00 | $1,000.00 |
| Suma de Auxiliar | $1,000.00 | ||||
| Costo Directo | $64,720.58 |