| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 130802 | Tablero control de alumbrado | un |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| RELE | Rele alumbrado publico 120V 60A | un | 1.000000 | $362,828.00 | $362,828.00 |
| CABLECOBT06 | Cable cobre THHN/THWN 6 awg | ml | 5.000000 | $5,421.00 | $27,105.00 |
| FOTOC | Fotocelda lum 105-130V gris | un | 1.000000 | $20,160.00 | $20,160.00 |
| VARIO | Varios electricos | un | 1.000000 | $1,318.00 | $1,318.00 |
| Suma de Material | $411,411.00 | ||||
| Mano de Obra | |||||
| ZCUADIEL | Cuadrilla Instalaciones Eléctricas | jor | 0.638570 | $116,803.00 | $74,586.89 |
| Suma de Mano de Obra | $74,586.89 | ||||
| Herramienta | |||||
| HERRA | Herramienta menor | (%)mo | 0.050000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| TRMAT | Transporte materiales | glo | 10.000000 | $1,000.00 | $10,000.00 |
| Suma de Auxiliar | $10,000.00 | ||||
| Costo Directo | $495,997.89 |