| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 040105 | Recintes | m3 |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| PIEDRAE2 | Piedra de entresuelo (sum + transp) | m3 | 0.300000 | $66,125.00 | $19,837.50 |
| CLAVOSCOM1-3 | Clavos comunes 1½ a 3½" | lb | 0.200000 | $1,364.00 | $272.80 |
| Suma de Material | $20,110.30 | ||||
| Mano de Obra | |||||
| ZCUADEST | Cuadrilla Estructura | jor | 0.971050 | $115,595.00 | $112,248.52 |
| Suma de Mano de Obra | $112,248.52 | ||||
| Herramienta | |||||
| HERRA | Herramienta menor | (%)mo | 0.050000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Equipo | |||||
| CANES | Can madera comun 2.5 A 3.00 m (Alquiler) | dÃa | 0.200000 | $278.00 | $55.60 |
| TELERA1 | Telera madera 1.35 x 0.90m | dÃa | 3.000000 | $335.00 | $1,005.00 |
| TACOMET02 | Taco metalico corto 1.80 - 2.80m | dÃa | 24.000000 | $140.00 | $3,360.00 |
| Suma de Equipo | $4,420.60 | ||||
| Concepto | |||||
| 050201 | Concreto 2000 psi en obra | m3 | 0.700000 | $261,470.00 | $183,029.00 |
| Suma de Concepto | $183,029.00 | ||||
| Costo Directo | $319,808.42 |