| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| 110604 | Caja 40 x 40 en mamposteria | un |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| LADRBN6X12X25 | Ladrillo bocadillo natural 6x12x25 | un | 36.820000 | $447.00 | $16,458.54 |
| ACERO60SF01 | Acero refuerzo G-60 sin figurar | kg | 0.600000 | $1,892.00 | $1,135.20 |
| ALAMBRREC18 | Alambre recocido C 18 | kg | 0.010000 | $2,050.00 | $20.50 |
| Suma de Material | $17,614.24 | ||||
| Mano de Obra | |||||
| ZCUADEST | Cuadrilla Estructura | jor | 0.461230 | $115,595.00 | $53,315.88 |
| Suma de Mano de Obra | $53,315.88 | ||||
| Herramienta | |||||
| HERRA | Herramienta menor | (%)mo | 0.066000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Concepto | |||||
| 050208 | Mortero 1: 3 de pega | m3 | 0.058900 | $333,881.00 | $19,665.59 |
| 050203 | Concreto 3000 psi en obra | m3 | 0.090200 | $294,870.00 | $26,597.27 |
| Suma de Concepto | $46,262.86 | ||||
| Costo Directo | $117,192.99 |