| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| 40104 | Acero de refuerzo f'y=4200 Kg/cm2, del no. 4 ( 1/2" de 脴 ) en estructura, elevaci贸n por medios manuales, incluye suministro, habilitado y armado. | kg |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| 0085-01 | VARILLA FY=4200 KG/CM2 NO. 4 ( 1/2" ) | kg | 1.080000 | $11.50 | $12.42 |
| 0085-01 | VARILLA FY=4200 KG/CM2 NO. 4 ( 1/2" ) | kg | 1.080000 | $11.50 | $12.42 |
| 0085-01 | VARILLA FY=4200 KG/CM2 NO. 4 ( 1/2" ) | kg | 1.080000 | $11.50 | $12.42 |
| 0085-01 | VARILLA FY=4200 KG/CM2 NO. 4 ( 1/2" ) | kg | 1.080000 | $11.50 | $12.42 |
| 0085-01 | VARILLA FY=4200 KG/CM2 NO. 4 ( 1/2" ) | kg | 1.080000 | $11.50 | $12.42 |
| 0085-01 | VARILLA FY=4200 KG/CM2 NO. 4 ( 1/2" ) | kg | 1.080000 | $11.50 | $12.42 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 0.035500 | $13.02 | $0.46 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 0.035500 | $13.02 | $0.46 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 0.035500 | $13.02 | $0.46 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 0.035500 | $13.02 | $0.46 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 0.035500 | $13.02 | $0.46 |
| 0082-05 | ALAMBRE RECOCIDO NO. 16 | kg | 0.035500 | $13.02 | $0.46 |
| Suma de Material | $77.29 | ||||
| Mano de Obra | |||||
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 0.005882 | $928.59 | $5.46 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 0.005882 | $928.59 | $5.46 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 0.005882 | $928.59 | $5.46 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 0.005882 | $928.59 | $5.46 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 0.005882 | $928.59 | $5.46 |
| 02-0620 | CUADRILLA No 62 ( 1 FIERRERO + 1 AYUDANTE DE FIERRERO ) | jor | 0.005882 | $928.59 | $5.46 |
| Suma de Mano de Obra | $32.77 | ||||
| Herramienta | |||||
| 00-0001 | Herramienta menor | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0001 | Herramienta menor | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0001 | Herramienta menor | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0001 | Herramienta menor | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0001 | Herramienta menor | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0001 | Herramienta menor | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0002 | Equipo de seguridad | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0002 | Equipo de seguridad | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0002 | Equipo de seguridad | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0002 | Equipo de seguridad | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0002 | Equipo de seguridad | (%)mo | 0.040000 | $0.00 | $0.00 |
| 00-0002 | Equipo de seguridad | (%)mo | 0.040000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 0.035000 | $2.33 | $0.08 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 0.035000 | $2.33 | $0.08 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 0.035000 | $2.33 | $0.08 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 0.035000 | $2.33 | $0.08 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 0.035000 | $2.33 | $0.08 |
| SEP-CON001 | SEPARADOR DE CONCRETO PARA CALZAR ACERO DE REFUERZO. | pieza | 0.035000 | $2.33 | $0.08 |
| Suma de Auxiliar | $0.49 | ||||
| Concepto | |||||
| G105120-1015 | Elevaci贸n de acero refuerzo en atados de 1/2 ton. con malacate y pluma del nivel 0 al 25, no incluye acarreos horizontales. | ton | 0.001100 | $669.28 | $0.74 |
| G105120-1015 | Elevaci贸n de acero refuerzo en atados de 1/2 ton. con malacate y pluma del nivel 0 al 25, no incluye acarreos horizontales. | ton | 0.001100 | $669.28 | $0.74 |
| G105120-1015 | Elevaci贸n de acero refuerzo en atados de 1/2 ton. con malacate y pluma del nivel 0 al 25, no incluye acarreos horizontales. | ton | 0.001100 | $669.28 | $0.74 |
| G105120-1015 | Elevaci贸n de acero refuerzo en atados de 1/2 ton. con malacate y pluma del nivel 0 al 25, no incluye acarreos horizontales. | ton | 0.001100 | $669.28 | $0.74 |
| G105120-1015 | Elevaci贸n de acero refuerzo en atados de 1/2 ton. con malacate y pluma del nivel 0 al 25, no incluye acarreos horizontales. | ton | 0.001100 | $669.28 | $0.74 |
| G105120-1015 | Elevaci贸n de acero refuerzo en atados de 1/2 ton. con malacate y pluma del nivel 0 al 25, no incluye acarreos horizontales. | ton | 0.001100 | $669.28 | $0.74 |
| Suma de Concepto | $4.42 | ||||
| Costo Directo | $114.97 |