| Clave | Descripci贸n del An谩lisis de Precio Unitario | Unidad |
| PAV-07 CM | SUMINISTRO Y TENDIDO DE MEZCLA ASFALTICA EN CALIENTE DE 7 CMS. DE ESPESOR COMPACTADOS CON MATERIAL TRITURADO T.M.A. 3/4" A FINOS Y CEMENTO ASFALTICO AC-20 EN PROP. DE 130 KG/M3, ELABORADO EN PLANTA, INCLUYE: ADQUISICION, COMPACTACION AL 95%, BARRIDO DE LA SUPERFICIE Y ACARREOS. | M2 |
| Clave | Descripci贸n | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO ASFALTICO | CONCRETO ASFALTICO | m3 | 0.082000 | $1,150.00 | $94.30 |
| FM-1 | RIEGO DE ROMPIMIENTO MEDIO IMPREGNACION | LT | 1.500000 | $4.50 | $6.75 |
| FR-3 | FR-3 | lt | 0.500000 | $4.10 | $2.05 |
| Suma de Material | $103.10 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 13 | (RASTRILLERO,TORNILLERO,AYUDANTE) | JOR | 0.012000 | $1,040.30 | $12.48 |
| Suma de Mano de Obra | $12.48 | ||||
| Equipo | |||||
| COMPACTADOR DYNAPACA | COMPACTADOR DYNAPAC CA 262 MOTOR 152 HP ANCHO DE RODILLO 2.13 M | HR | 0.040000 | $197.48 | $7.90 |
| RODILLO DE NEUMATICO | RODILLO DE NEUMATICO | HR | 0.050000 | $238.61 | $11.93 |
| PETROLIZADORA | PETROLIZADORA hidrostatica de fabricacion nacional marca seaman gunnison modelo 1580-crm | HR | 0.040000 | $99.25 | $3.97 |
| Suma de Equipo | $23.80 | ||||
| Costo Directo | $139.38 |