| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| AT-30X30X35 | CONSTRUCCION DE ATRAQUES DE CONCRETO FC 150 KG/CM2 DE 30 X 30 35 CMS NCLUYE TODO O NECESARIO PARA SU CORRECTA EJECUCION. | PZA |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| CONCRETO 150 KG/CM2 | CONCRETO 150 KG/CM2 | M3 | 0.030000 | $720.00 | $21.60 |
| CLAVO | CLAVO | KG | 0.396000 | $14.20 | $5.62 |
| DIESEL | DIESEL | litro | 0.500000 | $4.31 | $2.16 |
| ALAMBRE RECOCIDO | ALAMBRE RECOCIDO | Kg | 0.140000 | $14.87 | $2.08 |
| MADERA-6 | CIMBRAPLAY 16 MM HOJA DE 1.22 X 2.44 | M2 | 0.400000 | $96.00 | $38.40 |
| MADERA-3 | MADERA DE PINO DE 3A. | PT | 1.300000 | $5.61 | $7.29 |
| Suma de Material | $77.15 | ||||
| Mano de Obra | |||||
| CUADRILLA NO. 10 | (1 OF. CARPINTERO DE OBRA NEGRA + 2 AYUDANTES DE CARPINTERO DE OBRA NEGRA) | JOR | 0.120000 | $917.62 | $110.11 |
| CUADRILLA NO. 03 | (1 Of. Albanil + 5 Peones). | JOR | 0.100000 | $1,688.87 | $168.89 |
| Suma de Mano de Obra | $279.00 | ||||
| Equipo | |||||
| VIBRADORCONCRETO | VIBRADOR PARA CONCRETO DYNAPAC-KOHLER K-91 4 H.P. LONGITUD 14 PIES | HR | 0.100000 | $20.29 | $2.03 |
| Suma de Equipo | $2.03 | ||||
| Costo Directo | $358.18 |