| Clave | Descripción del Análisis de Precio Unitario | Unidad |
| IM01-29 | CONSTRUCCION DE CANAL PLUVIAL DE CONCRETO F'c= 200 KG/CM2, DE 1.50 M DE ANCHO Y 12 CM DE ESPESOR ARMADA CON MALLA ELECTROSOLDADA 66-10/10 | ML |
| Clave | Descripción | Unidad | Cantidad | Costo | Importe |
| Material | |||||
| MALLA ELEC 6-6/6-6 1 | MALLA ELECTROSOLDADA 6-6/6-6 | M2 | 1.500000 | $33.86 | $50.79 |
| CURACRETO 1 | CURACRETO | LTO | 0.250000 | $18.00 | $4.50 |
| Suma de Material | $55.29 | ||||
| Mano de Obra | |||||
| CABO DE OFICIOS 1 | CABO DE OFICIOS | JOR | 0.007500 | $290.45 | $2.18 |
| OPERARIO PRIMERA 1 | OPERARIO PRIMERA | JOR | 0.075000 | $233.90 | $17.54 |
| AYUDANTE OPERARIO 1 | AYUDANTE OPERARIO | JOR | 0.075000 | $181.41 | $13.61 |
| Suma de Mano de Obra | $33.33 | ||||
| Herramienta | |||||
| HERRAMIENTA MENOR 1 | HERRAMIENTA MENOR | (%)mo | 0.030000 | $0.00 | $0.00 |
| Suma de Herramienta | $0.00 | ||||
| Auxiliar | |||||
| CIM Y DESCIM 1 | CIMBRA Y DESCIMBRA | M2 | 0.700000 | $159.93 | $111.95 |
| CONCRETO F-C=200 1 | CONCRETO F'c=200 KG/CM2 | M3 | 0.180000 | $1,311.84 | $236.13 |
| VAC DE CONC 1 | VACIADO DE CONCRETO | M3 | 0.180000 | $215.24 | $38.74 |
| Suma de Auxiliar | $386.83 | ||||
| Costo Directo | $475.44 |