| Material | | | | |
| MAC-018 | Madera pino 3a, 1" x 4" x 8.25' | pt | 0.001500 | $9.33 | $0.01 |
| MAC-025 | Madera pino 3a, 2" x 4m x 8.25’ | pt | 0.002500 | $9.33 | $0.02 |
| MAC-005 | Cal hl datada, saco 25 kg | ton | 0.000200 | $1,575.08 | $0.32 |
| MAC-021 | Carrete de hilo plastico | m | 0.350000 | $0.24 | $0.08 |
| MAC-022 | Pintura de esmalte comex 100, comex | cub | 0.000100 | $1,242.64 | $0.12 |
| MAC-023 | Acero de refuerzo numero 4, 1/2" | kg | 0.010100 | $9.97 | $0.10 |
| MAC-020 | Clavo de 2 1/2" (6.35cm) de largo | kg | 0.000500 | $21.90 | $0.01 |
| MAC-018 | Madera pino 3a, 1" x 4" x 8.25' | pt | 0.001500 | $9.33 | $0.01 |
| MAC-025 | Madera pino 3a, 2" x 4m x 8.25’ | pt | 0.002500 | $9.33 | $0.02 |
| MAC-005 | Cal hl datada, saco 25 kg | ton | 0.000200 | $1,575.08 | $0.32 |
| MAC-021 | Carrete de hilo plastico | m | 0.350000 | $0.24 | $0.08 |
| MAC-022 | Pintura de esmalte comex 100, comex | cub | 0.000100 | $1,242.64 | $0.12 |
| MAC-023 | Acero de refuerzo numero 4, 1/2" | kg | 0.010100 | $9.97 | $0.10 |
| MAC-020 | Clavo de 2 1/2" (6.35cm) de largo | kg | 0.000500 | $21.90 | $0.01 |
| Suma de Material | | | | $1.32 |
| Mano de Obra | | | | |
| MOC-047 | Cuadrilla 56 (oficial albañil y tres peones), | jor | 0.002200 | $0.00 | $0.00 |
| MOC-047 | Cuadrilla 56 (oficial albañil y tres peones), | jor | 0.002200 | $0.00 | $0.00 |
| Suma de Mano de Obra | | | | $0.00 |
| Herramienta | | | | |
| HEC-001 | Herramienta menor | %mo | 3.000000 | $0.00 | $0.00 |
| HEC-001 | Herramienta menor | %mo | 3.000000 | $0.00 | $0.00 |
| Suma de Herramienta | | | | $0.00 |
| Equipo | | | | |
| EQC-003 | Nivel para medicion k-e, tipo dumpy | hr | 0.016000 | $447.07 | $7.15 |
| EQC-004 | Transito para medicion k-e, modelo | hr | 0.016000 | $447.69 | $7.16 |
| EQC-003 | Nivel para medicion k-e, tipo dumpy | hr | 0.016000 | $447.07 | $7.15 |
| EQC-004 | Transito para medicion k-e, modelo | hr | 0.016000 | $447.69 | $7.16 |
| Suma de Equipo | | | | $28.62 |
| Auxiliar | | | | |
| AUXCNRN-100 | Concreto f'c= 100 kg/cm2, fabricado en obra, resistencia normal, agregado maximo de 3/4", incluye materiales, desperdicios, mano de obra y equipo, revenimiento de 8 a 10 cm | m3 | 0.001000 | $1,933.94 | $1.93 |
| AUXCNRN-100 | Concreto f'c= 100 kg/cm2, fabricado en obra, resistencia normal, agregado maximo de 3/4", incluye materiales, desperdicios, mano de obra y equipo, revenimiento de 8 a 10 cm | m3 | 0.001000 | $1,933.94 | $1.93 |
| Suma de Auxiliar | | | | $3.86 |
| Costo Directo | | | | $33.80 |